Other Related Links
TE PDF Notes - Unit 7
Topics Covered - TE Pdf notes of Unit 7 are listed below:
Transporation Engineering Notes (TE) Unit 7
- PAVEMENT CONSTRUCTION
- Earthwork –cutting-Filling
- Preparation of subgrade
- Specification and construction of
- i) Granular Sub base, ii) WBM Base, iii) WMM base, iv) Bituminous Macadam, v) Dense Bituminous Macadam vi) Bituminous Concrete, vii) Dry Lean Concrete sub base and PQC viii) concrete roads
- HIGHWAY DRAINAGE
- Significance and requirements
- Surface drainage system and design, examples
- Sub surface drainage system
- Design of filter materials