🎓 PMC Notes Pdf 🕮 Pavement Materials and Construction VTU Free Lecture Notes

4.6
(19)

PMC Notes Pdf – Pavement Materials and Construction VTU Download Free Lecture Notes

Here you can download the Pavement Materials and Construction VTU Notes Pdf – PMC VTU of as per VTU Syllabus. Below we have list all the links as per the modules.

Please find the download links of Pavement Materials and Construction VTU Notes Pdf – PMC VTU are listed below:

Pavement Materials and Construction VTU Notes Pdf - PMC VTU

Link: Complete Notes

——————————–

Pavement Materials and Construction Notes VTU

PART – A – PAVEMENT MATERIALS

Link: Part A Notes

————————–

UNIT – 1

AGGREGATES: Origin, classification, requirements, properties, and tests on road aggregates, concepts of size and gradation – design gradation, maximum aggregate size, aggregate blending to meet specification.

Link: Unit-1 

————————–

UNIT – 2

BITUMEN AND TAR: Origin, preparation, properties and chemical constitution of bituminous road binders; requirements.

Link: Unit-2 

————————–

UNIT – 3

BITUMINOUS EMULSIONS AND CUTBACKS: Preparation, characteristics, uses, and tests.Adhesion of Bituminous Binders to Road Aggregates: Adhesion failure, mechanism of stripping, tests, and methods of improving adhesion.

Link: Unit-3 

————————–

UNIT – 4

BITUMINOUS MIXES: Mechanical properties, dense and open-textured mixes, flexibility and brittleness, (no Hveem Stabilometer & Hubbard – Field Tests) bituminous mix, design methods using Rothfus‟ s Method only and specification using different criteria- voids in mineral aggregates, voids in total mix, density, flow, stability, percentage voids filled with bitumen.

Link: Unit-4 

————————–

PART – B – PAVEMENT CONSTRUCTION

Link: Part-B 

————————–

UNIT – 5

EQUIPMENT IN HIGHWAY CONSTRUCTION: Various types of equipment for excavation, grading, and compaction – their working principle, advantages, and limitations. Special equipment for bituminous and cement concrete pavement and stabilized soil road construction.

Link: Unit-5 

————————–

UNIT – 6

SUBGRADE: Earthwork grading and construction of embankments and cuts for roads.Preparation of subgrade, quality control tests.

Link: Unit-6 

————————–

UNIT – 7

FLEXIBLE PAVEMENTS: Specifications of materials, construction method and field control checks for various types of flexible pavement layers.

Link:Unit-7 

————————–

UNIT – 8

CEMENT CONCRETE PAVEMENTS: Specifications and method of cement concrete pavement construction; Quality control tests; Construction of various types of joints.

Link: Unit-8 

How useful was this post?

Click on a star to rate it!

Average rating 4.6 / 5. Vote count: 19

No votes so far! Be the first to rate this post.

Leave a Reply

Your email address will not be published. Required fields are marked *